90m3 concrete pumped into foundations for new scout building in Sutton Coldfield, set up 07.00 1st load 07.30, wrapped up & cleaned down for 15.00. Customer chuffed to bits.
Very long pipeline
Our longest pipeline yet... nearly 200m of pipe laid to reach an in-accessible area alongside railway track... back-breaking work but very satisfying!
Rear patio base, Solihull
We placed the C35 concrete for a porcelain patio to the rear of this prestigious new- property in Solihull. Rather than laying pipes around the outside our skilled operator boomed the concrete over the roof.
Internal factory job
Tight squeeze into a factory in Coventry this week, 45m3 C50 structural concrete for machine bases, supplied & pumped in a morning. Our customer was very impressed... he'd previously used one of the national suppliers who took all day to supply !
Factory floor
500m3 C40 over 3 dsys into a new factory floor in Minworth. Call the readymix professionals on 01675 223233, big, small, footings, floors.... we've got it covered